Switchgear testing procedure pdf free

All material can be ordered from abb kraft ab on telephone int. In an electric power system, switchgear is composed of electrical disconnect switches, fuses or circuit breakers used to control, protect and isolate electrical equipment. Take precautions and observe safety procedures before servicing the breaker or equipment. Mv clad switch gear instalaltion and testing procedure duration. It will provide electricians who are new to primary testing the basic knowledge required to perform acceptance testing of the medium voltage switchgear to 38000 volts. Standard for acceptance testing specifications for. Current limiting reactors in power system and their arrangement calculation of fault mva for symmetrical short circuits. Electrical equipment site acceptance testing eaton. Medium voltage switchgear specification page 1 medium voltage metal clad switchgear part 1 general 1. Ansineta standard for acceptance testing specifications for electrical power equipment and systems are clearly identified in writing as the source of all such uses or reproductions. If the switchgear is to be stored, inspect it to make sure the shipment is complete and undamaged. In addition, for electrical tests, steps were added to perform online partialdischarge survey and system function tests.

The be3200 is a high speed test sequencer for switchgear applications. Arrangement of bus bar, circuit breaker and isolator. Mc switchgear is compartmentalized to isolate components such as instrumentation, main bus, and both incoming and outgoing connections with grounded metal barriers. Count on certified onsite installation and commissioning by abb experts for high reliability and optimum lifecycle performance from first operation. This document is not part of a manual but it is published to the energy networks internet site. Thus, implementing an effective switchgear testing, inspection, and maintenance program is essential. Information to be given with enquiries, tenders and orders. All outputs and inputs of the be3200 are fiber optically isolated. The goal of most electrical industry standards is to protect the user of. The megger insulation tester is essentially a highrange resistance meter ohmmeter with a builtin directcurrent generator. Installation and commissioning onsite installation and commissioning by certified abb experts.

Sep 11, 2017 lv switchgear and controlgear type test alfanar. Xradiation test procedure for vacuum interrupters clause 6. Tests on auxiliary and control circuits iec 62271100 7. Switchgear is used both to deenergize equipment to allow work to be done and to clear faults downstream. Partial discharge testing and infrared scanning can be used to obtain data on the performance of the insulation system and the integrity of the switchgear busbars and cable terminations. Standard for acceptance testing specifications for electrical.

Electrical switchgear safety a guide for owners and users this is a webfriendly version of leaflet indg372rev1, published 04 introduction this guidance is for owners and operators of electrical switchgear in industrial and commercial organisations with little electrical knowledge or expertise available inhouse. Lv panel testing procedure in new 2017lv switchgear testinglv switchgear panel duration. Testing manual for electrical equipment requirements are fulfilled. By the end of this course the participants will have the basic knowledge to perform commissioning and acceptance testing of the mv switchgear using safe working practices and referencing the neta standard as a guideline. Electrical switchboard switchgear testing and commissioning. Introduction the procedures stated in this document cover the activities in preliminary tests and inspections, functional performance tests and the commissioning of newly completed installations and existing ones after major alteration. Inspection, test and measurement procedures for lv and mv. Completely read each procedure while looking at the actual parts before beginning. The switchgear system ax1 is system for the distribution of medium voltage in power and industrial installations. Most importantly all measuring tools must have valid calibration certificate at the time of switchgear testing and commissioning of switchgear. We offer electrical maintenance which complies with the neta acceptance standards for testing and maintenance.

Lv panel testing procedure in new 2017lv switchgear. The term electrical maintenance refers to a program of regular inspection and service of equipment to detect potential problems and to take proper corrective measures through the approved work process controls. Startup service scheduling must be available through a 24hour, tollfree. Switchgear, transformers, cables, overhead lines, surge arresters. A switchgear consists of a number of switchgear cubicles with connecting equipment and one or more support cubicles. Since each discharge causes of a flow of charge, the pd can be detected by measuring the current pulses on the terminals of high voltage equipment. While doing the hv test the steps to be followed are. Although each particular product line is governed by its own industry standards, switchgear and motor control equipment of the types built by powell are generally subject to three major categories of tests.

Pdf mv switchgear inspection and test procedure find, read and cite all the research you need on researchgate. If the switchgear is going to be installed as soon as it has been received, unpack it and handle it according to the procedure outlined in the following paragraphs. High voltage test is done by applying 80% of factorytested voltage. The switchgear specification manager will be subject to new releases andor revisions accordingly. Iec 62271 is the basis of the standards of sc17a highvoltage switchgear and sc17c highvoltage switchgear assemblies. Testing and commissioning procedure for electrical installation 1. Mounting of specimen for testing radiation instrument to verify the xradiation. A limits and scope of use of the switchgear assembly. This handbook provides general guidelines for the proper maintenance of electrical switchgear used in postal facilities. Factory acceptance tests fat the routine tests shall be made with each electrical equipment and, whenever practicable. The break er was closed and the control s w itch w. Damage to the switchgear itself can be extremely expensive, but that pales in comparison to corollary damage and the potential hazards to people. Inspection, testing and commissioning of electrical. Offline pd testing has been as a factory test for almost 100 years on.

If you are interested in full list of method statement for electrical testing and commissioning please. Iec and ieee standards for highvoltage switchgear and. Section 7 of the ansineta standard for acceptance testing specifications for electrical. The most important tests for medium voltage metalenclosed. Xradiation test procedure for vacuum interrupters the purpose of this type test is to verify that the xradiation emitted from vacuum interrupters does not exceed specified limits. Manual installation commissioning environment and recycling. Standard for testing specifications electrical power. The design of the gasinsulated switchgears can significantly vary from isolated. This section specifies the furnishing, installation, connection and testing of the medium voltage switchgear. Testing and commissioning certificate on low voltage cubicle switchboard.

Gasinsulated switchgear gis is a spacesaving alternative to classic outdoor switchgear. Since 1989, revised editions of the maintenance testing specifications have been published in 1993, 1997, and 2001. The megger insulation tester is a small, portable instrument that gives you a direct reading of insulation resistance in ohms or megohms. Switchgear testing, maintenance and cleaning powercom. Rather, maintenance information is presented for five classes of switchgear equipment. Section 7 inspection and test procedures section 8 system function test. Substations and switchgear in an electrical system perform the functions of voltage transformation, system protection, power factor correction metering, and circuit switching. This article covers testing and startup commisioning procedures for all the components of medium voltage switchgear like circuit breaker, busbars, instrument transformers currentvoltage, disconnect and grounding switches etc. The checklists are in pdf format and can be completed electronically or printed and used as hard copy. Technical specification for startup and commissioning of new. Electrical insulation testing of hv equipment up to 33kv. The first neta maintenance testing specifications for electrical power equipment and systems was published in 1975. Oct 28, 2016 system function test for switchgear and switchboards.

The international electrical testing association neta was formed in 1972 to establish uniform testing procedures for electrical equipment and apparatus. Engage the controller in the manual mode and step through the various. Inspect physical, electrical, and mechanical condition including evidence of moisture or corona. Procedure in cases where pressure testing is not possible. Thoroughly understand what is to be done and follow the procedure step by step. Medium voltage switchgear ax1 is described in many different publications and even in a multimedia presentation on cdrom. Jun 18, 2019 for the visual and mechanical inspection procedure for switchgear, switchboard, and panelboard assemblies, a new step was added to verify that wiring connections are tight and wiring is secure.

Medium voltage switchgear construction checklist page 1 of 6 version 0206 medium voltage switchgear construction checklist over 500 kva project. We service electrical circuit breaker panels and panelboards, motor contr. Jan 03, 2011 the supply and primary switchgear for a large electrical installation. Electrical switchboard switchgear testing and commissioning manual from 3. Preventive testing and maintenance carried out on a regular basis guarantee that everything functions reliably should a fault occur. Applies to all medium voltage metalclad switchgear assemblies designed, tested and manufactured in accordance with ieee c37. Metalclad mc mediumvoltage switchgear that contains drawout electrically operated circuit breakers is covered. Switchgear testing and maintenance the security of supply depends on switchgear being available at all times and functioning correctly. After the insulation resistance test, voltage withstand tests for main circuit and control circuit shall be carried out, and no electrical or mechanical defects shall be found. Switchgear and switchboard inspection and testing guide. For the testing earthed circuit, the connection to the earth shall be removed before the test.

Improve the quality control of the project and simplify the procedures for engineers. The tool invites you to complete four types of design input data forms levels of information, i. It is a complete switchgear system, prepared and operations tested on delivery. Functional test is to be done according to the drawings given. For older switchgear, a condition assessment should be performed to establish that the equipment remains in a suitable condition for further service. Electrical power aparatus, such as transformers, regulators, air switches, circuit breakers, capacitors. Switchgear testing facilities for acbs, rccbs, rcbos, mcbs, contactors, starters, ltht panel assemblies, bus bar truncking system, ht circuit breakers, vcbs. The procedure for system functional testing exceeds far beyond the scope of this document. Testing and commissioning requirements for switchgear. Neta developed specifications for the acceptance of new electrical apparatus prior to energization and for the maintenance of existing apparatus to determine its suitability to remain in service. Instruction sheet ms28 maintenance of electrical switchgear tl4. Even switchgear labeled maintenance free requires periodic testing and maintenance.

The complete guide to electrical insulation testing. Switchgear and controls within equipment shall be in the closed position or bypassed. The test procedure described are applicable to metal clad switchboards. With central elements such as busbars, disconnectors and circuit breakers, switchgears represent the hubs of electrical energy grids. Guide design and assembly according to iec 61439 en 61439. Procedure h r a 7 switchgear mechanical operation test procedure iec, nec, nema, fdf, iso ansi, ci, ipcea iec, nec, nema, fdf, iso ansi, ci, ipcea procedure h r a inspection and test plan for switchgear before manufacturing materials activity by no. This type of equipment is directly linked to the reliability of the electricity supply. In this article i go to share the actual what we do in after panel switchgear installation and what are the procedure of switchgear testing and commissioning. Required tests for switchgear and its components test denomination standard sub clause value 1. Switchgear testing requires a device for accurate sequence and timing control. Electrical operation test for equipment installed in switchgear and mcc circuit breakers, magnetic contactors, switches, and relays, etc.

The ant i p ump feature in t he breakers w ere tested as fol low s. This standard provides information essential to designing and testing of metalclad switchgear. Lv panel testing procedure in new 2017lv switchgear testinglv switchgear panel. American national standard for switchgearmedium voltage.

Circuit breaker repairrefurbishingcarolina precision switchgear. You only need to change project name and insert logos etc and the same shall be ready to be submitted for approval from clients. For good insulation, the resistance usually reads in the megohm range. Standard for maintenance testing specifications for electrical power equipment and systems is the most. Philosophy of protection, nature, causes and consequences of faults, zone of protection, requirements of a protective scheme, basic terminology components of protection scheme. Testing manual for electrical equipment nahed alhajeri 1and anantha madhavan 2 abstract quality assurance qa refers to a program for the systematic monitoring and evaluation of the various aspects of a project, service, or facility to ensure that standards of quality are being met. To verify the physical condition and proper connections of bus bar. Ms28 handbook maintenance of electrical switchgear tl4. Schneider electric, a world leader in low voltage assemblies and devices, is here to help you achieve the stage of testing you need. Included herein are preferred ratings, required design test procedures, and acceptance criteria. Download method statement for mv lv switchgear panel testing. With a wealth of expertise and indepth knowledge of testing to the new iec 61439 standards, our test laboratory provides a. The above equipment and systems integral to them are complete and ready for functional testing.

Installation and commissioning services for switchgear. Repack it so it will be protected until it has been installed. Covers selected tests to demonstrate conformance with. All workers to comply the safety requirements such as safety shoes, safety helmet, safety glasses, fluorescent vest, and safety gloves to ensure maximum ability of safe work. The following rule is applied to the numbering of the standards. Electrical inspection checklists this pdf contains 77 electrical inspection checklists taken from the 2014 electrical inspection manual with checklists. System function tests should be performed in accordance with ansinetaats section 8 during initial switchgearswitchboard acceptance.

Inspection and test plan reference document acceptance criteria verifying document 1. In 2005, this document was approved for the first time as an american national standard. Sep 22, 2015 in this standard, metalclad switchgear will be called mc switchgear. Switchgear and protective devices 2015 3 p a g e syllabus switchgear and protective devices 310 modulei 10 hours protective devices. The correct installation and commissioning will ensure a high degree of operational reliability.